Software testing life cycle 

By: Sreeja Venugopal

Software testing life cycle identifies what test activities to carry out and when (what is the best time) to accomplish those test activities. Even though testing differs between organizations, there is a testing life cycle.

Software Testing Life Cycle consists of six (generic) phases:

  • Test Planning,
  • Test Analysis,
  • Test Design,
  • Construction and verification,
  • Testing Cycles,
  • Final Testing and Implementation and
  • Post Implementation.

 
Software testing has its own life cycle that intersects with every stage of the SDLC. The basic requirements in software testing life cycle is to control/deal with software testing – Manual, Automated and Performance.

Test Planning

This is the phase where Project Manager has to decide what things need to be tested, do I have the appropriate budget etc. Naturally proper planning at this stage would greatly reduce the risk of low quality software. This planning will be an ongoing process with no end point.

Activities at this stage would include preparation of high level test plan-(according to IEEE test plan template The Software Test Plan (STP) is designed to prescribe the scope, approach, resources, and schedule of all testing activities. The plan must identify the items to be tested, the features to be tested, the types of testing to be performed, the personnel responsible for testing, the resources and schedule required to complete testing, and the risks associated with the plan.). Almost all of the activities done during this stage are included in this software test plan and revolve around a test plan.

Test Analysis

Once test plan is made and decided upon, next step is to delve little more into the project and decide what types of testing should be carried out at different stages of SDLC, do we need or plan to automate, if yes then when the appropriate time to automate is, what type of specific documentation I need for testing.

Proper and regular meetings should be held between testing teams, project managers, development teams, Business Analysts to check the progress of things which will give a fair idea of the movement of the project and ensure the completeness of the test plan created in the planning phase, which will further help in enhancing the right testing strategy created earlier. We will start creating test case formats and test cases itself. In this stage we need to develop Functional validation matrix based on Business Requirements to ensure that all system requirements are covered by one or more test cases, identify which test cases to automate, begin review of documentation, i.e. Functional Design, Business Requirements, Product Specifications, Product Externals etc. We also have to define areas for Stress and Performance testing.

Test Design

Test plans and cases which were developed in the analysis phase are revised. Functional validation matrix is also revised and finalized. In this stage risk assessment criteria is developed. If you have thought of automation then you have to select which test cases to automate and begin writing scripts for them. Test data is prepared. Standards for unit testing and pass / fail criteria are defined here. Schedule for testing is revised (if necessary) & finalized and test environment is prepared.

Construction and verification

In this phase we have to complete all the test plans, test cases, complete the scripting of the automated test cases, Stress and Performance testing plans needs to be completed. We have to support the development team in their unit testing phase. And obviously bug reporting would be done as when the bugs are found. Integration tests are performed and errors (if any) are reported.

Testing Cycles

In this phase we have to complete testing cycles until test cases are executed without errors or a predefined condition is reached. Run test cases --> Report Bugs --> revise test cases (if needed) --> add new test cases (if needed) --> bug fixing --> retesting (test cycle 2, test cycle 3….).

Final Testing and Implementation

In this we have to execute remaining stress and performance test cases, documentation for testing is completed / updated, provide and complete different matrices for testing. Acceptance, load and recovery testing will also be conducted and the application needs to be verified under production conditions.

Post Implementation

In this phase, the testing process is evaluated and lessons learnt from that testing process are documented. Line of attack to prevent similar problems in future projects is identified. Create plans to improve the processes. The recording of new errors and enhancements is an ongoing process. Cleaning up of test environment is done and test machines are restored to base lines in this stage.

Ref: http://editorial.co.in/software/software-testing-life-cycle.php 

 

Other Related Articles

Comparison Between Black Box & White Box Testing
Making The Decision To Automate Your Software Testing
What is Software Testing
Beta Testing, Anyone? 10 Potent Strategies for Achieving Success
Software Testing and Software Development Lifecycles
An Introduction to Software Testing
Assessment in the software testing course
The Essentials of Software Testing

BLACK BOX TESTING
Functional Testing
Stress Testing
Load Testing
Ad-hoc Testing
Exploratory Testing
Usability Testing
Smoke Testing
Recovery Testing
Volume Testing
Domain Testing
Scenario testing
Regression Testing
User Acceptance
Alpha Testing
Beta Testing
WHITE BOX TESTING
Unit Testing
Static & dynamic Analysis
Statement Coverage
Branch Coverage
Security Testing
Mutation Testing
Interview Questions
General Questions
WinRunner Questions
LoadRunner Questions
SQA Questions
Test Automation Questions
CERTIFICATIONS
ISQTB
CSTE
CSTP
CTM
CSQA
CSPM
CSPE


latest QA / Testing Documents
Test Director Interview Questions | Software testings FAQ
Test Director Interview Questions ... Software testings FAQs ..What is Test Director ... What are all the main features of Test Director.. How the assessment of the application will be taken place in Test Director .. etc etc
QA interview questions
What is verification, What is validation, What is a walkthrough, What is an inspection, What is quality, What is good code, What is good design, What is software life cycle, What is the difference between alpha and beta testing, What is the difference between volume testing and load testing etc...
Software Quality Engineer Certification - CSQE
The Certified Software Quality Engineer understands software quality development and implementation, software inspection, testing, verification and validation; and implements software development and maintenance processes and methods.
Certified Software Quality Analyst | CSQA
Acquiring the designation of Certified Software Quality Analyst (CSQA) indicates a professional level of competence in the principles and practices of quality assurance in the IT profession.
TESTING GENERAL INTERVIEW QUESTIONS
TESTING GENERAL INTERVIEW QUESTIONS
Certifications General details
General details of different software testing certifications.
HP LoadRunner software—tips and tricks for configuration, scripting and execution
This guide provides tips and tricks for HP LoadRunner software configuration, scripting, and execution. It is a conglomerate of lessons learned by HP LoadRunner power user Opral Wisham,including unique code as well as code collected from other testers. This guide is intended to help testers just learning to use HP LoadRunner, as well as to provide new best practices for those who have used HP LoadRunner for many years.
Performance Testing Why and How
Why Performance Testing,Performance Testing Workflow,HP LoadRunner Solutions
Web HTTP Connection Patterns When Load-Testing Using LoadRunner
HTTP Connections In a web environment clients communicate with the server using HTTP connections. A connection can be one-shot or persistent. One shot connection are used for one interaction, when the server has responded the connection is closed. Persistent connections are kept open for use in subsequent interactions. Persistent connections are closed by the client when it has finished with the server or by the server if the connection is inactive for too long.
what is LoadRunner
LoadRunner is a performance and load testing product by Hewlett-Packard (since it acquired Mercury Interactive in November 2006) for examining system behaviour and performance, while generating actual load.

Popular 5 QA / Testing Documents

TESTING GENERAL INTERVIEW QUESTIONS
TESTING GENERAL INTERVIEW QUESTIONS
QA interview questions
What is verification, What is validation, What is a walkthrough, What is an inspection, What is quality, What is good code, What is good design, What is software life cycle, What is the difference between alpha and beta testing, What is the difference between volume testing and load testing etc...
Test Director Interview Questions | Software testings FAQ
Test Director Interview Questions ... Software testings FAQs ..What is Test Director ... What are all the main features of Test Director.. How the assessment of the application will be taken place in Test Director .. etc etc
Test Case Checklists
Details of Test Case Checklists
Performance Testing Why and How
Why Performance Testing,Performance Testing Workflow,HP LoadRunner Solutions
QA / Testing Documents categories .. posted by users
Software Testing
Study Materials ,  Certification ,  FAQ ,  
Quality Assurance
Certification ,  FAQ ,  Study materials ,  
Testing Tools
WinRunnerLoadRunnerTest Director
Jobs
Jobs in INDIA ,  
 

  

Custom Search
  site contact support@testingbrain.com All of the product names here are trademarks of their respective companies. Use information on this site at your own risk. Information furnished in the site is collected from various sites and posts from users. This site does not host any files on its server. If any compliants about the posts please contact us at support@testingbrain.com, we are ready to move the posts.
Complete Software Testing Study materials | Testing JOBS | PDF Tutorials page counter